• Studio Apartment Unit Type
  • 550 sq ft
  • 1 Towers
  • 22 Acres Total Area

Property Details

Purvanchal Royal Square is the latest launched tower by Purvanchal Projects at the easily commutable destination of Greater Noida. They are 1 BHK fully furnished studio apartments loaded with all the amenities and features. It is right above the retail shops and convenience stores.

The size offered is 550 Sq.ft that has Purvanchal Projects have already successfully delivered many projects like Royal City Phase 1 (Greater Noida), Royal Park (Sector-137, Noida), Silver City (Sector-93, Noida), Silver Estate (Sector-50, Noida) and Purvanchal Heights (Greater Noida).

Royal Square has only 1 tower with G+23 floors to be one of its kinds. As per the floor plan there are only 6 units per floor that has 1 BHK fully furnished apartments in size of 550 Sq.ft (Super built-up area) that incorporates 1 hall, room, kitchen, toilet and balcony. And the possession will be offered by March 2023.

RERA registration number- UPRERAPRJ295195

Features and Amenities
• Sauna and steam bath
• Swimming pool
• Kid’s Foundation School
• Retail Stores
• Gymnasium
• E-Library
• Nursery School
• Crèche And Kids Play Zone
• Golf Carts
• Indoor/Outdoor Games
• Concierge Services
• 3500*Sq. ft. Fully Equipped Gym
• 70% open area

Location Advantages
• Located at Plot No. GH-05, Sector CHI-V, Greater Noida.
• Seamless connectivity to Delhi-NCR.
• In proximity to school, colleges, malls and hospitals.
• Metro station and Yamuna Expressway in close reach.
• Major attractions like F1 racing track and night safari are located nearby.

Avail the Extra unbelievable offers on Royal Square
• Refrigerator
• Microwave
• Sofa
• Bed With mattress
• LED TV
• Utensils
• Curtains
• Air Conditioners
• Wardrobe
• Lights, fan and 1 Geyser
• Individual RO unit
• Modular kitchen with chimney and HOB

Purvanchal Royal Square is something you can define as small box with big benefits and have everything under one roof.

Location Map & Site Plan

Floor Plans

Price List

Construction Update